Sun For Rent/Mobile Solar
Updated Aug 31, 2026

Working Dashboard

One view for every call. Active work on top, links to live resources, and the full backlog below.

Open It Up

Active Work

Priority Order
#
Co.
Item
Status
1
SFR
Fleet dashboard and tracker rebuild
Six screens built and click-verified, three design variants offered. Zac needs to pick a layout and schedule a walkthrough.
Waiting
2
SFR
SRX-9/12/15 Operator Guide
At V6 after two review rounds, near done. Two blockers: outlet panel model mismatch and battery voltage thresholds need Zac/Aaron.
Active
3
MOSO
Manufacturing ops: stable part IDs
Assign stable part IDs in the Master Equipment List, then amend the SRX line ticket template.
Active
4
MOSO
SRX Technical Manual for purchasers
SRX-6 first, authored in Google Docs. Working draft and blueprint on disk. Five spec contradictions block final lock.
Active
5
Both
GHL account migration
Decision needed, then pipeline and automation work behind it.
Waiting
6
SFR
Voice AI on SFR numbers
Main line resolved. Rachel's line staged and needs a test.
Active
7
Both
Website: SEO baseline, nav updates, AI optimization
Ongoing.
Active

Next Up

SFR
Real GPS coordinates on the dashboard map
Six-decimal positions available for 53 of 56 trackers. Held until Zac says the map matters to him.
SFR
Serial allowlist for portal pulls
Portals cover 61 and 56 units against a fleet of 83. Only 2 yard units monitored, sold units still have live profiles.
MOSO
Figure standard and redrawing workstream
Every SRX drawing is a hand-drawn pencil sketch with no text layer. Every figure in every manual gets redrawn.
Both
Datasheet redesign across SRX, MS, SA, M1 series
Dual brand.
SFR
GHL pipeline audit
Automations, email and SMS sequences. Pipeline stages Re-Engage and Not a Fit, fix probabilities.
Both
Site hosting migration off Taylor's servers
Also unblocks serving guides as raw HTML.
MOSO
Read remaining shop process documents
Gen Install SOP, Radian Install SOP, Serial Plate SOP, Shop B and Shop C flow, Inventory Training.

Parked

Done Since July 1

Process Reference